被窝屋福利片

235宅宅理论电影

6S management training meeting held
Published on: 2021-12-17 10:25:52 by Wang Xinfeng[ ]

In order to better promote the college laboratory 6S The management and construction work is standardized, orderly and efficient, and the laboratory of the whole hospital is completed on schedule 6S According to the requirements of the implementation rules of laboratory standardization management of Shandong University and the unified deployment of the University, the college has set up a comprehensive management standard two thousand and twenty-one year twelve month fifteen On the afternoon of June, the laboratory of mechanical engineering college was held 6S Management and construction training meeting, marking 6S The construction work was officially launched. Jia Cundong, vice president of the college, presided over the meeting and did the laboratory of mechanical engineering college 6S The arrangement of management work was carried out by Liang Xichang and Du Yicong, the experimental technicians of the college 6S Management explanation and experience sharing.

Jia Cundong's Laboratory 6S Management and construction of the work deployment, stressed that we should seriously in accordance with the "Mechanical College Laboratory" 6S Construction management work plan, solid promotion college laboratory 6S Administration. The college was established under the leadership of the Secretary of the Party committee 6S Management of the special leading group, according to the actual situation set up two working groups, and the follow-up Laboratory of the college 6S The management work has done the detailed work arrangement and the node request, seriously emphasized does not participate in the Institute 6S For the laboratories that fail to meet the requirements of management or interim audit, the college will issue a notice to stop the use of laboratories and uniformly deploy them. At the same time, it briefly introduces the "three levels and three checks" mechanism of laboratory safety management.

Liang Xichang carried out the pilot project of intelligent manufacturing technology and equipment laboratory 6S Management work, to the laboratory 6S The management specification and instruction manual are explained in detail, analyzed one by one, and shared in the laboratory 6S Problems encountered in the construction process and corresponding solutions. Du Yicong combined with the previous research laboratory in the basement of Xipei building 6S Management work, sharing the construction process may encounter problems and related solutions experience. The two teachers showed and shared the experience and materials summarized in the early construction work.

After the meeting, a mechanical college was established 6S Build a working group, and package relevant systems and conference materials to teachers and graduate students. Party branch secretary of each department, all experimental technicians, supervisors of scientific research laboratory and relevant graduate students eighty Others attended the meeting.

Previous: The college was approved as a public training base for the transformation of new and old kinetic energy in Shandong Province Next: The 13th Engineering Seminar (Shandong University Kumamoto University) successfully held

close

Copyright © 2017-2020 School of mechanical engineering, Shandong University All Rights Reserved
Office address: Qianfoshan campus, Shandong University, 17923 Jingshi Road, Jinan City, Shandong Province postcode: 250061 Tel: 0531-88392608 Fax: 0531-88392608

http://4.kvxs.cnhttp://7.kvxs.cnhttp://0.kvxs.cnhttp://5.kvxs.cnhttp://7.kvxs.cnhttp://9.kvxs.cnhttp://1.kvxs.cnhttp://1.kvxs.cnhttp://9.kvxs.cnhttp://8.kvxs.cn